BORED PILES

  1. Soil Drilling
  2. Coring of 1500 mm Diameter Granite Rock
  3. Inserting of tremie pipe for concreting
  4. Setting of casing using Vibro Hammer

GROUTING WORKS

for contiguous

bored piles

TEST PILES

  1. 3000 ton Load test (MLT)
  2. Preparation of 1.8 dia bored pile for test
  3. Dynamic Pile test (PDA)
  4. Bi-Directional test (BDLT)

SECANTPILE / CONTIGUOUS BORED PILE WALLS

  1. Drilling of Secant pile
  2. Setting of casing forSecant pile
  3. Guidewall for Secant pile
  4. Secant pile after completion
  5. Contiguous Bored pile wall

STRUTTING & STEEL DECKING WORKS

BASEMENT AND EXCATION WORKS

SHOTCRETE WALLS

INSTRUMENTATION WORKS

студия продвижения сайтовкаялОтзывы о Топкаргоcan you get a loan with no jobодностворчатое окно